Boykins 115 kV (AD2-208)

Boykins 115 kV is a 100.0 MW solar interconnection project in City Of Portsmouth, Virginia with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBoykins 115 kV
Queue IDAD2-208
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateVirginia
CountyCity Of Portsmouth
Point of interconnection
Requested (queue) date2018-03-30
Proposed in-service date
Operational date
Withdrawn date2018-04-05
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata