BPP NY Lansing BESS I (1585)

BPP NY Lansing BESS I is a 200.0 MW battery interconnection project in Tompkins, New York with a current status of withdrawn. It is proposed to connect at Milliken 115 kV Substation.

200.0 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameBPP NY Lansing BESS I
Queue ID1585
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity200.0 MW
StateNew York
CountyTompkins
Point of interconnectionMilliken 115 kV Substation
Requested (queue) date2023-07-31
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperBear Peak Power LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata