BRADMORE BESS FKA BRADMORE ES (1209)

BRADMORE BESS FKA BRADMORE ES is a 412.0 MW battery interconnection project in Los Angeles, California with a current status of withdrawn. It is proposed to connect at Antelope 220kV bus.

412.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBRADMORE BESS FKA BRADMORE ES
Queue ID1209
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity412.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionAntelope 220kV bus
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2019-05-21
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata