Braen Energy Storage Phase 1 (C24-089)

Braen Energy Storage Phase 1 is a 500.0 MW battery interconnection project in Rockland, New York with a current status of withdrawn. It is proposed to connect at Ramapo 345kV Substation.

500.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameBraen Energy Storage Phase 1
Queue IDC24-089
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity500.0 MW
StateNew York
CountyRockland
Point of interconnectionRamapo 345kV Substation
Requested (queue) date2024-08-14
Proposed in-service date
Operational date
Withdrawn date
DeveloperBraen Energy LLC
Utility / transmission ownerCONED

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata