Brandy DP-Remington 115 kV (AE2-186)

Brandy DP-Remington 115 kV is a 60.0 MW solar interconnection project in Fauquier, Virginia with a current status of withdrawn.

60.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBrandy DP-Remington 115 kV
Queue IDAE2-186
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity60.0 MW
StateVirginia
CountyFauquier
Point of interconnection
Requested (queue) date2019-03-18
Proposed in-service date2020-09-01
Operational date
Withdrawn date2019-04-29
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata