Bridge Street 1 & 2 (57598_BS2)

Bridge Street 1 & 2 is a 2.6 MW other interconnection project in New London, Connecticut with a current status of operational.

2.6 MWCapacity
OperationalStatus
ISNEMarket
OtherTechnology

Project facts

Canonical nameBridge Street 1 & 2
Queue ID57598_BS2
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyOther
Capacity2.6 MW
StateConnecticut
CountyNew London
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2010-07-01
Withdrawn date
Developer
Utility / transmission ownerConnecticut Mun Elec Engy Coop

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.