Connecticut Mun Elec Engy Coop is associated with 22 tracked interconnection projects representing 59 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

22Projects
0Active
22Operational
0Withdrawn
59 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other2052 MW
Gas27 MW

Geographic footprint

StateProjects
Connecticut21
New York1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Subase Microgrid Project59701_SFC1Gas3.7 MWoperationalNew London, Connecticut
Subase Microgrid Project59701_SFC2Gas3.7 MWoperationalNew London, Connecticut
Water Treatment 1 & 257605_WT2Other2.6 MWoperationalNew London, Connecticut
Fort Hill 1, 2, 3 & 457599_FH1Other2.6 MWoperationalNew London, Connecticut
LNG 1 & 257603_LNG1Other2.6 MWoperationalNew London, Connecticut
Backus Microgrid Project59415_BMP4Other2.6 MWoperationalNew London, Connecticut
Backus Microgrid Project59415_BMP2Other2.6 MWoperationalNew London, Connecticut
Gary Court 1 & 257601_GC1Other2.6 MWoperationalNew London, Connecticut
Fort Hill 1, 2, 3 & 457599_FH2Other2.6 MWoperationalNew London, Connecticut
Water Treatment 1 & 257605_WT1Other2.6 MWoperationalNew London, Connecticut
Bridge Street 1 & 257598_BS2Other2.6 MWoperationalNew London, Connecticut
Fort Hill 1, 2, 3 & 457599_FH4Other2.6 MWoperationalNew London, Connecticut
Fort Hill 1, 2, 3 & 457599_FH3Other2.6 MWoperationalNew London, Connecticut
Jewett City 157602_JC1Other2.6 MWoperationalNew London, Connecticut
LNG 1 & 257603_LNG2Other2.6 MWoperationalNew London, Connecticut
Fishers Island 157600_FI1Other2.6 MWoperationalSuffolk, New York
Gary Court 1 & 257601_GC2Other2.6 MWoperationalNew London, Connecticut
Backus Microgrid Project59415_BMP1Other2.6 MWoperationalNew London, Connecticut
Bridge Street 1 & 257598_BS1Other2.6 MWoperationalNew London, Connecticut
Lebanon Pines 1 & 257604_LP2Other2.6 MWoperationalNew London, Connecticut
Lebanon Pines 1 & 257604_LP1Other2.6 MWoperationalNew London, Connecticut
Backus Microgrid Project59415_BMP3Other2.6 MWoperationalNew London, Connecticut

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Connecticut Mun Elec Engy Coop.

Start tracking with interXdata