Briery-Clover 230kV (AC1-162)

Briery-Clover 230kV is a 240.0 MW solar interconnection project in Prince Edward, Virginia with a current status of withdrawn.

240.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameBriery-Clover 230kV
Queue IDAC1-162
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity240.0 MW
StateVirginia
CountyPrince Edward
Point of interconnection
Requested (queue) date2016-10-31
Proposed in-service date2019-10-01
Operational date
Withdrawn date2019-02-26
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata