Briggs Storage II (27INR0482)

Briggs Storage II is a 250.0 MW battery interconnection project in Haskell, Texas with a current status of withdrawn. It is proposed to connect at 345kV Kilby Station (60089).

250.0 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameBriggs Storage II
Queue ID27INR0482
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity250.0 MW
StateTexas
CountyHaskell
Point of interconnection345kV Kilby Station (60089)
Requested (queue) date2025-06-18
Proposed in-service date2027-12-30
Operational date
Withdrawn date2025-07-21
DeveloperBriggs Solar, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata