Brightside Solar Alt POI (23INR0487)

Brightside Solar Alt POI is a 50.0 MW solar interconnection project in Live Oak, Texas with a current status of operational. It is proposed to connect at 8156 Charter Substation 138kV.

50.0 MWCapacity
OperationalStatus
Live OakMarket
SolarTechnology

Project facts

Canonical nameBrightside Solar Alt POI
Queue ID23INR0487
Statusoperational
Source statusSS Completed, FIS Not Started, IA
MarketLive Oak
TechnologySolar
Capacity50.0 MW
StateTexas
CountyLive Oak
Point of interconnection8156 Charter Substation 138kV
Requested (queue) date2022-05-16
Proposed in-service date
Operational date2026-08-14
Withdrawn date
DeveloperBrightside Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata