Brinton Fork Solar (22INR0272)

Brinton Fork Solar is a 513.5 MW solar interconnection project in Haskell, Texas with a current status of withdrawn. It is proposed to connect at 60791 Perigee 345kV.

513.5 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBrinton Fork Solar
Queue ID22INR0272
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity513.5 MW
StateTexas
CountyHaskell
Point of interconnection60791 Perigee 345kV
Requested (queue) date2019-12-16
Proposed in-service date2024-12-31
Operational date
Withdrawn date2023-12-04
DeveloperEDF Renewables Development, Inc.
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata