Broadford-Jackson Ferry Phase II 765kV (Z1-078)

Broadford-Jackson Ferry Phase II 765kV is a 777.0 MW gas interconnection project in Unknown, Virginia with a current status of withdrawn.

777.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameBroadford-Jackson Ferry Phase II 765kV
Queue IDZ1-078
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity777.0 MW
StateVirginia
CountyUnknown
Point of interconnection
Requested (queue) date2013-10-30
Proposed in-service date2018-06-15
Operational date
Withdrawn date2014-11-10
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata