Broadview (2308)

Broadview is a 816.4 MW solar+battery interconnection project in Fresno, California with a current status of active. It is proposed to connect at LOS BANOS-GATES #3.

816.4 MWCapacity
ActiveStatus
CAISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameBroadview
Queue ID2308
Statusactive
Source statusactive
MarketCAISO
TechnologySolar+Battery
Capacity816.4 MW
StateCalifornia
CountyFresno
Point of interconnectionLOS BANOS-GATES #3
Requested (queue) date2023-04-17
Proposed in-service date2028-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata