Brockton Combined Cycle CNR Increase (443)

Brockton Combined Cycle CNR Increase is a 354.9 MW gas interconnection project in Plymouth, Massachusetts with a current status of withdrawn. It is proposed to connect at Grid 115 kV E20 and F19 Lines.

354.9 MWCapacity
WithdrawnStatus
SEMAMarket
GasTechnology

Project facts

Canonical nameBrockton Combined Cycle CNR Increase
Queue ID443
Statuswithdrawn
Source statusW
MarketSEMA
TechnologyGas
Capacity354.9 MW
StateMassachusetts
CountyPlymouth
Point of interconnectionGrid 115 kV E20 and F19 Lines
Requested (queue) date2014-03-03
Proposed in-service date2019-05-31
Operational date
Withdrawn date2017-05-25
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata