Bronze Fork Solar is a 515.9 MW solar interconnection project in Haskell, Texas with a current status of withdrawn. It is proposed to connect at Tap 345kV 60515 Clear Crossing - 1421 Willow Creek.

515.9 MWCapacity
WithdrawnStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameBronze Fork Solar
Queue ID22INR0271
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologySolar
Capacity515.9 MW
StateTexas
CountyHaskell
Point of interconnectionTap 345kV 60515 Clear Crossing - 1421 Willow Creek
Requested (queue) date2019-12-16
Proposed in-service date2022-12-01
Operational date
Withdrawn date2022-01-11
DeveloperEDF Renewables Development, Inc.
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.