Brotman U1 U2 Power Station (23INR0613)

Brotman U1 U2 Power Station is a 102.0 MW gas interconnection project in Brazoria, Texas with a current status of operational.

102.0 MWCapacity
OperationalStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameBrotman U1 U2 Power Station
Queue ID23INR0613
Statusoperational
Source statusoperational
MarketERCOT
TechnologyGas
Capacity102.0 MW
StateTexas
CountyBrazoria
Point of interconnection
Requested (queue) date2023-03-26
Proposed in-service date
Operational date2023-06-19
Withdrawn date
Developer
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata