BRP Avila II BESS (23INR0333)
BRP Avila II BESS is a 63.7 MW other interconnection project in Pecos, Texas with a current status of withdrawn. It is proposed to connect at 138 kV Airport Substation (#38340;TNMP).
63.7 MWCapacity
WithdrawnStatus
ERCOTMarket
OtherTechnology
Project facts
| Canonical name | BRP Avila II BESS |
|---|---|
| Queue ID | 23INR0333 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Other |
| Capacity | 63.7 MW |
| State | Texas |
| County | Pecos |
| Point of interconnection | 138 kV Airport Substation (#38340;TNMP) |
| Requested (queue) date | 2021-10-20 |
| Proposed in-service date | 2023-06-15 |
| Operational date | — |
| Withdrawn date | 2021-11-01 |
| Developer | BRP Avila BESS LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata