BRP Mekong BESS (24INR0135)

BRP Mekong BESS is a 409.9 MW other interconnection project in Robertson, Texas with a current status of operational. It is proposed to connect at Tap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950) .

409.9 MWCapacity
OperationalStatus
RobertsonMarket
OtherTechnology

Project facts

Canonical nameBRP Mekong BESS
Queue ID24INR0135
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRobertson
TechnologyOther
Capacity409.9 MW
StateTexas
CountyRobertson
Point of interconnectionTap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950)
Requested (queue) date2021-12-20
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperBRP Mekong BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata