Robertson County, Texas — Interconnection Projects
The interXdata warehouse tracks 35 interconnection projects in Robertson, Texas, representing 7,837 MW of requested capacity.
35Total projects
3Active
29Operational
3Withdrawn
7,837 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 22 | 4,941 MW |
| Solar | 6 | 1,887 MW |
| Battery | 5 | 854 MW |
| Solar+Battery | 1 | 110 MW |
| Coal | 1 | 45 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Oak Grove (TX) | 6180_OG1 | Other | 916.8 MW | operational | Robertson, Texas |
| Oak Grove (TX) | 6180_OG2 | Other | 878.6 MW | operational | Robertson, Texas |
| Big Rooter East Solar | 29INR0017 | Solar | 554.7 MW | operational | Robertson, Texas |
| BRP Mekong BESS | 24INR0135 | Other | 409.9 MW | operational | Robertson, Texas |
| Big Rooter West Solar | 26INR0431 | Solar | 403.2 MW | operational | Robertson, Texas |
| Buffalo Prairie Storage | 25INR0288 | Other | 308.0 MW | operational | Robertson, Texas |
| Milky Way Solar | 24INR0046 | Solar | 300.0 MW | withdrawn | Robertson, Texas |
| Coati Solar | 24INR0323 | Solar | 296.1 MW | withdrawn | Robertson, Texas |
| Buffalo Meadow Solar | 25INR0331 | Solar | 251.3 MW | operational | Robertson, Texas |
| Tidwell Prairie Storage 1 | 21INR0517 | Battery | 204.0 MW | operational | Robertson, Texas |
| Bee Branch IA | 23INR0421 | Other | 203.8 MW | operational | Robertson, Texas |
| Barton Branch IA | 22INR0504 | Other | 203.6 MW | operational | Robertson, Texas |
| Tidwell Prairie II Batt | 22INR0503 | Other | 203.6 MW | operational | Robertson, Texas |
| Big Rooter West Storage | 26INR0432 | Other | 201.1 MW | operational | Robertson, Texas |
| Big Rooter East Storage | 29INR0018 | Other | 201.0 MW | operational | Robertson, Texas |
| Barton Branch IA | 69392_BBIA | Battery | 200.0 MW | active | Robertson, Texas |
| Tidwell Prairie Storage 1 | 66337_SGES1 | Battery | 200.0 MW | operational | Robertson, Texas |
| Tidwell Prairie II | 68425_TWPII | Battery | 200.0 MW | active | Robertson, Texas |
| Major Oak Power | 7030_1 | Other | 174.6 MW | operational | Robertson, Texas |
| Major Oak Power | 7030_2 | Other | 174.6 MW | operational | Robertson, Texas |
| Coati Storage | 24INR0325 | Other | 146.0 MW | withdrawn | Robertson, Texas |
| Camp Creek Solar SLF | 23INR0385 | Solar+Battery | 110.0 MW | active | Robertson, Texas |
| Pioneer Path Energy Storage 3 | 27INR0424 | Other | 102.1 MW | operational | Robertson, Texas |
| Pioneer Path Energy Storage 2 | 27INR0423 | Other | 102.1 MW | operational | Robertson, Texas |
| Pioneer Path Energy Storage 4 | 27INR0425 | Other | 102.1 MW | operational | Robertson, Texas |
| Prairie Horizon Energy Storage 2 | 27INR0427 | Other | 102.1 MW | operational | Robertson, Texas |
| Pioneer Path Energy Storage 1 | 27INR0418 | Other | 102.1 MW | operational | Robertson, Texas |
| Prairie Horizon Energy Storage 1 | 27INR0426 | Other | 102.1 MW | operational | Robertson, Texas |
| Prairie Horizon Energy Storage 4 | 27INR0429 | Other | 102.1 MW | operational | Robertson, Texas |
| Prairie Horizon Energy Storage 3 | 27INR0428 | Other | 102.1 MW | operational | Robertson, Texas |
| Stegall Solar | 25INR0497 | Solar | 81.6 MW | operational | Robertson, Texas |
| Republic Road Storage | 21INR0460 | Other | 51.8 MW | operational | Robertson, Texas |
| Stegall Storage | 25INR0498 | Other | 50.5 MW | operational | Robertson, Texas |
| TX11 Republic Road Storage | 65694_TX11 | Battery | 50.0 MW | operational | Robertson, Texas |
| Oak Grove Units 1 & 2 repower | 19INR0204 | Coal | 45.0 MW | operational | Robertson, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Tempus Power management LLC | 8 | 817 MW |
| Big Rooter West, LLC | 4 | 1,360 MW |
| Buffalo Meadow Energy Center, LLC | 2 | 559 MW |
| Tidwell Prairie LLC | 2 | 408 MW |
| Coati Solar, LLC | 2 | 442 MW |
| BT Martin Solar, LLC | 2 | 132 MW |
| Aurora Solar LLC | 1 | 300 MW |
| Barton Branch IA LLC | 1 | 204 MW |
| Bee Branch IA LLCBee Branch IA LLC | 1 | 204 MW |
| White Rock Solar, LLC | 1 | 110 MW |
| BRP Mekong BESS LLC | 1 | 410 MW |
| KCE TX 11, LLC | 1 | 52 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Robertson County.
Start tracking with interXdata