Brule 115kV Substation (GEN-2018-016)

Brule 115kV Substation is a 100.8 MW wind interconnection project in Brule, Nebraska with a current status of withdrawn. It is proposed to connect at Brule 115kV Substation.

100.8 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameBrule 115kV Substation
Queue IDGEN-2018-016
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity100.8 MW
StateNebraska
CountyBrule
Point of interconnectionBrule 115kV Substation
Requested (queue) date2018-04-27
Proposed in-service date
Operational date
Withdrawn date2022-03-23
Developer
Utility / transmission ownerNPPD

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata