Buck Ranch Storage SLF (27INR0376)

Buck Ranch Storage SLF is a 40.8 MW other interconnection project in Live Oak, Texas with a current status of operational. It is proposed to connect at 5690 WEST GEORGE WEST SUB 69kV.

40.8 MWCapacity
OperationalStatus
Live OakMarket
OtherTechnology

Project facts

Canonical nameBuck Ranch Storage SLF
Queue ID27INR0376
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketLive Oak
TechnologyOther
Capacity40.8 MW
StateTexas
CountyLive Oak
Point of interconnection5690 WEST GEORGE WEST SUB 69kV
Requested (queue) date2025-01-28
Proposed in-service date
Operational date2028-08-09
Withdrawn date
DeveloperBuck Ranch Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata