Buckingham-Bremo 230 kV (AI2-027)

Buckingham-Bremo 230 kV is a 50.0 MW battery interconnection project in Buckingham, Virginia with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameBuckingham-Bremo 230 kV
Queue IDAI2-027
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateVirginia
CountyBuckingham
Point of interconnection
Requested (queue) date2022-12-22
Proposed in-service date2028-12-31
Operational date
Withdrawn date2025-11-03
Developer
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.