Buffalo Gap 4 (19INR0138)

Buffalo Gap 4 is a 175.0 MW wind interconnection project in Nolan, Texas with a current status of withdrawn. It is proposed to connect at 66216 Bluff Creek 138kV.

175.0 MWCapacity
WithdrawnStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameBuffalo Gap 4
Queue ID19INR0138
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyWind
Capacity175.0 MW
StateTexas
CountyNolan
Point of interconnection66216 Bluff Creek 138kV
Requested (queue) date2017-10-05
Proposed in-service date2020-09-01
Operational date
Withdrawn date2020-03-13
DeveloperAES DE DEVCO NC LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.