Burna Tap - Joy 69.0kV (J2756)

Burna Tap - Joy 69.0kV is a 42.0 MW solar interconnection project in Livingston, Kentucky with a current status of withdrawn. It is proposed to connect at Burna Tap - Joy 69.0kV.

42.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameBurna Tap - Joy 69.0kV
Queue IDJ2756
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity42.0 MW
StateKentucky
CountyLivingston
Point of interconnectionBurna Tap - Joy 69.0kV
Requested (queue) date2022-09-09
Proposed in-service date2025-11-01
Operational date2025-11-01
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.