Byllesby 2 (3773_2)

Byllesby 2 is a 5.4 MW other interconnection project in Carroll, Virginia with a current status of operational.

5.4 MWCapacity
OperationalStatus
PJMMarket
OtherTechnology

Project facts

Canonical nameByllesby 2
Queue ID3773_2
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyOther
Capacity5.4 MW
StateVirginia
CountyCarroll
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1912-01-01
Withdrawn date—
Developer—
Utility / transmission ownerAppalachian Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata