Bynum Solar Project (24INR0181)
Bynum Solar Project is a 56.0 MW solar interconnection project in Coryell, Texas with a current status of active. It is proposed to connect at Tap 69kV 37470 Olsen - 37520 Sycamore.
56.0 MWCapacity
ActiveStatus
ERCOTMarket
SolarTechnology
Project facts
| Canonical name | Bynum Solar Project |
|---|---|
| Queue ID | 24INR0181 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Solar |
| Capacity | 56.0 MW |
| State | Texas |
| County | Coryell |
| Point of interconnection | Tap 69kV 37470 Olsen - 37520 Sycamore |
| Requested (queue) date | 2021-12-18 |
| Proposed in-service date | 2026-02-06 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Bynum Solar Project, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.