CA Queue Project 2019-G42 — Solar+Battery in San Bernardino County, California

CA Queue Project 2019-G42 — Solar+Battery in San Bernardino County, California is a 160.0 MW solar+battery interconnection project in San Bernardino County, California with a current status of active. It is proposed to connect at Headgate-Blythe.

160.0 MWCapacity
ActiveStatus
CAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCA Queue Project 2019-G42 — Solar+Battery in San Bernardino County, California
Queue ID2019-G42
Statusactive
Source status
MarketCA
TechnologySolar+Battery
Capacity160.0 MW
StateCalifornia
CountySan Bernardino County
Point of interconnectionHeadgate-Blythe
Requested (queue) date2019-06-27
Proposed in-service date2021-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Desert Southwest Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata