CA Queue Project 2024-G2 — Solar in Shasta, California

CA Queue Project 2024-G2 — Solar in Shasta, California is a 125.0 MW solar interconnection project in Shasta, California with a current status of active. It is proposed to connect at Round Mtn-Cottonwood #1 230 kV Transmission Line.

125.0 MWCapacity
ActiveStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project 2024-G2 — Solar in Shasta, California
Queue ID2024-G2
Statusactive
Source statusActive
MarketCA
TechnologySolar
Capacity125.0 MW
StateCalifornia
CountyShasta
Point of interconnectionRound Mtn-Cottonwood #1 230 kV Transmission Line
Requested (queue) date2024-11-01
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Sierra Nevada Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-sn-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata