CA Queue Project G0547 — Solar in Modoc, California

CA Queue Project G0547 — Solar in Modoc, California is a 80.0 MW solar interconnection project in Modoc, California with a current status of withdrawn. It is proposed to connect at BPA Canby-Surprise Valley Electric Substation (SVE) 69 kV bus, via a tie line, or the SVE Co-op system..

80.0 MWCapacity
WithdrawnStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project G0547 — Solar in Modoc, California
Queue IDG0547
Statuswithdrawn
Source statusWITHDRAWN
MarketCA
TechnologySolar
Capacity80.0 MW
StateCalifornia
CountyModoc
Point of interconnectionBPA Canby-Surprise Valley Electric Substation (SVE) 69 kV bus, via a tie line, or the SVE Co-op system.
Requested (queue) date2016-06-20
Proposed in-service date2019-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.