Modoc County, California — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Modoc, California, representing 857 MW of requested capacity.

12Total projects
1Active
1Operational
10Withdrawn
857 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas2330 MW
Solar2280 MW
Solar+Battery5230 MW
Other317 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
AES Pacific IncG71Gas300.0 MWwithdrawnModoc, California
CA Queue Project G0868 — Solar in Modoc, CaliforniaG0868Solar200.0 MWwithdrawnModoc, California
CA Queue Project G0547 — Solar in Modoc, CaliforniaG0547Solar80.0 MWwithdrawnModoc, California
PACW Queue Project C1-41 — Solar+Battery in Modoc, CaliforniaC1-41Solar+Battery60.0 MWwithdrawnModoc, California
West Queue Project 1160 — Solar+Battery in Modoc, California1160Solar+Battery60.0 MWwithdrawnModoc, California
West Queue Project TCS-42 — Solar+Battery in Modoc, CaliforniaTCS-42Solar+Battery60.0 MWwithdrawnModoc, California
Cal GeoG90Gas30.0 MWwithdrawnModoc, California
PACW Queue Project C4-112 — Solar+Battery in Modoc, CaliforniaC4-112Solar+Battery24.9 MWwithdrawnModoc, California
PACW Queue Project T2-078 — Solar+Battery in Modoc, CaliforniaT2-078Solar+Battery24.9 MWactiveModoc, California
Canby SubstationL0349Other10.0 MWwithdrawnModoc, California
Knights Bridge SubstationL0324Other7.2 MWoperationalModoc, California
Industrial LoadL0384Other0.0 MWwithdrawnModoc, California

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: bpa-oasis; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Modoc County.

Start tracking with interXdata