Calamus East (S1140)

Calamus East is a 200.0 MW generation interconnection project in Clinton, Minnesota with a current status of operational. It is proposed to connect at Calamus East.

200.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameCalamus East
Queue IDS1140
Statusoperational
Source statusActive
Market
TechnologyGeneration
Capacity200.0 MW
StateMinnesota
CountyClinton
Point of interconnectionCalamus East
Requested (queue) date2026-03-07
Proposed in-service date2028-06-01
Operational date2028-06-01
Withdrawn date
Developer
Utility / transmission ownerGREAT RIVER ENERGY

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata