Calpine Guadalupe Peakers (24INR0145)

Calpine Guadalupe Peakers is a 450.0 MW gas interconnection project in Guadalupe, Texas with a current status of operational. It is proposed to connect at 7044 Marion 345kV.

450.0 MWCapacity
OperationalStatus
GuadalupeMarket
GasTechnology

Project facts

Canonical nameCalpine Guadalupe Peakers
Queue ID24INR0145
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGuadalupe
TechnologyGas
Capacity450.0 MW
StateTexas
CountyGuadalupe
Point of interconnection7044 Marion 345kV
Requested (queue) date2021-11-15
Proposed in-service date
Operational date2030-05-30
Withdrawn date
DeveloperGuadalupe Peaking Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata