Camino Ranch Solar SLF (24INR0412)

Camino Ranch Solar SLF is a 296.4 MW solar interconnection project in Houston, Texas with a current status of operational. It is proposed to connect at Tap to Jim English (#3351) – Flat Branch (#3345) 138kV.

296.4 MWCapacity
OperationalStatus
HoustonMarket
SolarTechnology

Project facts

Canonical nameCamino Ranch Solar SLF
Queue ID24INR0412
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketHouston
TechnologySolar
Capacity296.4 MW
StateTexas
CountyHouston
Point of interconnectionTap to Jim English (#3351) – Flat Branch (#3345) 138kV
Requested (queue) date2022-10-06
Proposed in-service date
Operational date2028-12-09
Withdrawn date
DeveloperCamino Ranch Solar Project LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata