Houston County, Texas — Interconnection Projects
The interXdata warehouse tracks 14 interconnection projects in Houston, Texas, representing 3,609 MW of requested capacity.
14Total projects
1Active
10Operational
3Withdrawn
3,609 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 7 | 2,292 MW |
| Other | 5 | 942 MW |
| Battery | 2 | 375 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV | J3441 | Solar | 500.0 MW | withdrawn | Houston, Texas |
| Crockett 345 kV Substation | GEN-2024-307 | Solar | 455.0 MW | withdrawn | Houston, Texas |
| Tap on Crossroad to Hobbs 345kV | CPP-2028-001 | Solar | 400.0 MW | operational | Houston, Texas |
| Camino Ranch Storage SLF | 24INR0420 | Other | 298.1 MW | operational | Houston, Texas |
| Camino Ranch Solar SLF | 24INR0412 | Solar | 296.4 MW | operational | Houston, Texas |
| Crockett - Rocky Creek 345 kV line | GEN-2024-232 | Solar | 250.0 MW | operational | Houston, Texas |
| ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV | J4104 | Battery | 250.0 MW | withdrawn | Houston, Texas |
| Camino Ranch Storage 2 SLF | 26INR0257 | Other | 238.4 MW | operational | Houston, Texas |
| Camino Ranch Solar 2 SLF | 26INR0256 | Solar | 237.2 MW | operational | Houston, Texas |
| Saint Charles Energy Storage | 26INR0363 | Other | 202.7 MW | operational | Houston, Texas |
| Dionysus Solar | 26INR0176 | Solar | 153.3 MW | operational | Houston, Texas |
| Houston County BESS | 27INR0196 | Other | 125.4 MW | operational | Houston, Texas |
| Houston County BESS | 68671_RIC91 | Battery | 125.0 MW | active | Houston, Texas |
| Dionysus Storage | 26INR0177 | Other | 77.3 MW | operational | Houston, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Camino Ranch Solar Project LLC | 4 | 1,070 MW |
| Dionysus Solar, LLC | 2 | 231 MW |
| RSN STORAGE 001, LLC | 1 | 203 MW |
| Houston ESS, LLC | 1 | 125 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; MISO — generator interconnection queue; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Houston County.
Start tracking with interXdata