Camino Ranch Storage 2 SLF (26INR0257)

Camino Ranch Storage 2 SLF is a 238.4 MW other interconnection project in Houston, Texas with a current status of operational. It is proposed to connect at Tap to Jim English (#3351) – Flat Branch (#3345) 138kV.

238.4 MWCapacity
OperationalStatus
HoustonMarket
OtherTechnology

Project facts

Canonical nameCamino Ranch Storage 2 SLF
Queue ID26INR0257
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketHouston
TechnologyOther
Capacity238.4 MW
StateTexas
CountyHouston
Point of interconnectionTap to Jim English (#3351) – Flat Branch (#3345) 138kV
Requested (queue) date2024-02-02
Proposed in-service date
Operational date2028-12-09
Withdrawn date
DeveloperCamino Ranch Solar Project LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata