Camp Grove (L05_CE22)

Camp Grove is a 150.0 MW wind interconnection project in Stark, Illinois with a current status of operational.

150.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameCamp Grove
Queue IDL05_CE22
Statusoperational
Source statusIn Service
Market
TechnologyWind
Capacity150.0 MW
StateIllinois
CountyStark
Point of interconnection
Requested (queue) date2003-10-15
Proposed in-service date
Operational date2007-12-14
Withdrawn date
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.