Stark County, Illinois — Interconnection Projects
The interXdata warehouse tracks 15 interconnection projects in Stark, Illinois, representing 2,314 MW of requested capacity.
15Total projects
0Active
5Operational
10Withdrawn
2,314 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 10 | 1,680 MW |
| Solar | 3 | 634 MW |
| Battery | 2 | 0 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Toulon 138kV | AH2-340 | Solar | 350.0 MW | withdrawn | Stark, Illinois |
| 7FARGO - 7SANDBURG 345.0kV | J3027 | Wind | 300.0 MW | operational | Stark, Illinois |
| Edwards - Kewanee East 138kV | AH2-342 | Solar | 280.0 MW | withdrawn | Stark, Illinois |
| Kewanee-Toulon 138 kV | AG2-527 - moved to TC2 | Wind | 200.0 MW | withdrawn | Stark, Illinois |
| PJM Queue Project AH1-297 — Wind in Stark, Illinois | AH1-297 | Wind | 200.0 MW | withdrawn | Stark, Illinois |
| 4BUREAU - 4EKEWANEE N 138.0kV | J3907 | Wind | 200.0 MW | operational | Stark, Illinois |
| Kewanee - E.D. Edwards 138 kV | AH1-297 - moved to TC2 | Wind | 200.0 MW | withdrawn | Stark, Illinois |
| PJM Queue Project AG2-527 — Wind in Stark, Illinois | AG2-527 | Wind | 200.0 MW | withdrawn | Stark, Illinois |
| Camp Grove | L05_CE22 | Wind | 150.0 MW | operational | Stark, Illinois |
| Camp Grove Wind Farm | 56640_1 | Wind | 150.0 MW | operational | Stark, Illinois |
| Kewanee-Powerton 138kV | P39 | Wind | 60.0 MW | withdrawn | Stark, Illinois |
| Kewanee | W3-133 | Wind | 19.5 MW | withdrawn | Stark, Illinois |
| Essex Solar | 69917_ESSEX | Solar | 4.0 MW | operational | Stark, Illinois |
| Toulon 138 kV | AH2-341 | Battery | 0.0 MW | withdrawn | Stark, Illinois |
| Edwards - Kewanee East 138kV | AH2-343 | Battery | 0.0 MW | withdrawn | Stark, Illinois |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Invenergy | 2 | 400 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue; PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.