CAMP ROCK WIND (203)

CAMP ROCK WIND is a 198.7 MW wind interconnection project in San Bernardino, California with a current status of withdrawn. It is proposed to connect at Cool Water-SEGS2-Tortilla 115kV line.

198.7 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameCAMP ROCK WIND
Queue ID203
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity198.7 MW
StateCalifornia
CountySan Bernardino
Point of interconnectionCool Water-SEGS2-Tortilla 115kV line
Requested (queue) date2007-04-19
Proposed in-service date
Operational date
Withdrawn date2011-04-01
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata