Campbell County 230 kV line (GEN-2016-087)

Campbell County 230 kV line is a 98.6 MW wind interconnection project in Campbell, South Dakota with a current status of active. It is proposed to connect at Campbell County 230 kV line.

98.6 MWCapacity
ActiveStatus
SDMarket
WindTechnology

Project facts

Canonical nameCampbell County 230 kV line
Queue IDGEN-2016-087
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketSD
TechnologyWind
Capacity98.6 MW
StateSouth Dakota
CountyCampbell
Point of interconnectionCampbell County 230 kV line
Requested (queue) date2016-07-25
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-22capacity_mw98.998.6high
2026-08-22proposed_online_date2026-12-312028-12-31medium
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.