Canadian River-Muskogee and Muskogee-Seminole 345kV (GEN-2017-040)
Canadian River-Muskogee and Muskogee-Seminole 345kV is a 200.1 MW solar interconnection project in Ochiltree County, Texas with a current status of active. It is proposed to connect at Canadian River-Muskogee and Muskogee-Seminole 345kV.
200.1 MWCapacity
ActiveStatus
TXMarket
SolarTechnology
Project facts
| Canonical name | Canadian River-Muskogee and Muskogee-Seminole 345kV |
|---|---|
| Queue ID | GEN-2017-040 |
| Status | active |
| Source status | IA FULLY EXECUTED/ON SCHEDULE |
| Market | TX |
| Technology | Solar |
| Capacity | 200.1 MW |
| State | Texas |
| County | Ochiltree County |
| Point of interconnection | Canadian River-Muskogee and Muskogee-Seminole 345kV |
| Requested (queue) date | 2017-05-31 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | OGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata