Ochiltree County County, Texas — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Ochiltree County, Texas, representing 950 MW of requested capacity.
5Total projects
1Active
0Operational
4Withdrawn
950 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 4 | 750 MW |
| Solar | 1 | 200 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Canadian River-Muskogee and Muskogee-Seminole 345kV | GEN-2017-045 | Wind | 200.1 MW | withdrawn | Ochiltree County, Texas |
| Canadian River-Muskogee and Muskogee-Seminole 345kV | GEN-2017-046 | Wind | 200.1 MW | withdrawn | Ochiltree County, Texas |
| Canadian River-Muskogee and Muskogee-Seminole 345kV | GEN-2017-040 | Solar | 200.1 MW | active | Ochiltree County, Texas |
| Canadian River-Muskogee and Muskogee-Seminole 345kV | GEN-2017-044 | Wind | 200.1 MW | withdrawn | Ochiltree County, Texas |
| Beaver County 345 kV | GEN-2015-006 | Wind | 150.0 MW | withdrawn | Ochiltree County, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Ochiltree County County.
Start tracking with interXdata