Ochiltree County County, Texas — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Ochiltree County, Texas, representing 950 MW of requested capacity.

5Total projects
1Active
0Operational
4Withdrawn
950 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind4750 MW
Solar1200 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Canadian River-Muskogee and Muskogee-Seminole 345kVGEN-2017-045Wind200.1 MWwithdrawnOchiltree County, Texas
Canadian River-Muskogee and Muskogee-Seminole 345kVGEN-2017-046Wind200.1 MWwithdrawnOchiltree County, Texas
Canadian River-Muskogee and Muskogee-Seminole 345kVGEN-2017-040Solar200.1 MWactiveOchiltree County, Texas
Canadian River-Muskogee and Muskogee-Seminole 345kVGEN-2017-044Wind200.1 MWwithdrawnOchiltree County, Texas
Beaver County 345 kVGEN-2015-006Wind150.0 MWwithdrawnOchiltree County, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Ochiltree County County.

Start tracking with interXdata