Carina BESS is a 154.1 MW battery interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at 88479 (138 kV CRINAPOI4A).
154.1 MWCapacity
OperationalStatus
ERCOTMarket
BatteryTechnology
Project facts
| Canonical name | Carina BESS |
|---|---|
| Queue ID | 22INR0353 |
| Status | operational |
| Source status | operational |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 154.1 MW |
| State | Texas |
| County | Nueces |
| Point of interconnection | 88479 (138 kV CRINAPOI4A) |
| Requested (queue) date | 2020-06-25 |
| Proposed in-service date | 2025-09-29 |
| Operational date | 2025-04-03 |
| Withdrawn date | — |
| Developer | BRP Carina BESS LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata