Carrizo Springs BESS is a 10.0 MW battery interconnection project in Dimmit, Texas with a current status of active. It is proposed to connect at Station Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV.
Project facts
| Canonical name | Carrizo Springs BESS |
|---|---|
| Queue ID | 25INR0592 |
| Status | active |
| Source status | active |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 10.0 MW |
| State | Texas |
| County | Dimmit |
| Point of interconnection | Station Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV |
| Requested (queue) date | 2024-08-22 |
| Proposed in-service date | 2025-12-03 |
| Operational date | 2025-12-04 |
| Withdrawn date | — |
| Developer | Regis Carrizo Springs LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata