Carrizo Springs BESS (25INR0592)

Carrizo Springs BESS is a 10.0 MW battery interconnection project in Dimmit, Texas with a current status of active. It is proposed to connect at Station Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV.

10.0 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameCarrizo Springs BESS
Queue ID25INR0592
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity10.0 MW
StateTexas
CountyDimmit
Point of interconnectionStation Name: CARRIZO SPRINGS Station Code: CARIZZO Load/Load XFMR Name: LOAD1 PTI Bus Number: #8244 Voltage in kV (Transmission): 69 kV Distribution Voltage: 12.47 kV
Requested (queue) date2024-08-22
Proposed in-service date2025-12-03
Operational date2025-12-04
Withdrawn date
DeveloperRegis Carrizo Springs LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata