Carson-Rawlings 500 kV (AE2-313 - moved to TC1)

Carson-Rawlings 500 kV is a 314.0 MW solar interconnection project in Dinwiddie, Virginia with a current status of withdrawn.

314.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCarson-Rawlings 500 kV
Queue IDAE2-313 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity314.0 MW
StateVirginia
CountyDinwiddie
Point of interconnection
Requested (queue) date2019-03-29
Proposed in-service date2022-09-15
Operational date
Withdrawn date2025-01-22
Developer
Utility / transmission ownerDominion

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.