Carson-Rogers Rd 500 kV (AE2-233)

Carson-Rogers Rd 500 kV is a 94.0 MW solar interconnection project in Accomack, Virginia with a current status of withdrawn.

94.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameCarson-Rogers Rd 500 kV
Queue IDAE2-233
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity94.0 MW
StateVirginia
CountyAccomack
Point of interconnection—
Requested (queue) date2019-03-22
Proposed in-service date2022-06-01
Operational date—
Withdrawn date2019-10-02
Developer—
Utility / transmission ownerDominion

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata