Cartanza 230kV is a 309.2 MW gas interconnection project in New Castle, Delaware with a current status of operational.

309.2 MWCapacity
OperationalStatus
—Market
GasTechnology

Project facts

Canonical nameCartanza 230kV
Queue IDW3-032A
Statusoperational
Source statusIn Service
Market—
TechnologyGas
Capacity309.2 MW
StateDelaware
CountyNew Castle
Point of interconnection—
Requested (queue) date2010-08-30
Proposed in-service date—
Operational date2015-06-01
Withdrawn date—
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.