Cascabel Wind 2 (23INR0561)

Cascabel Wind 2 is a 197.8 MW other interconnection project in Zapata, Texas with a current status of operational. It is proposed to connect at 345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)..

197.8 MWCapacity
OperationalStatus
ZapataMarket
OtherTechnology

Project facts

Canonical nameCascabel Wind 2
Queue ID23INR0561
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketZapata
TechnologyOther
Capacity197.8 MW
StateTexas
CountyZapata
Point of interconnection345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307).
Requested (queue) date2023-03-13
Proposed in-service date
Operational date2027-12-01
Withdrawn date
DeveloperVaquero Wind Energy, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.