Zapata County, Texas — Interconnection Projects
The interXdata warehouse tracks 42 interconnection projects in Zapata, Texas, representing 8,581 MW of requested capacity.
42Total projects
1Active
36Operational
4Withdrawn
8,581 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 20 | 4,038 MW |
| Solar | 11 | 2,642 MW |
| Wind | 7 | 1,672 MW |
| Battery | 4 | 230 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Falcon BESS | 29INR0169 | Other | 516.7 MW | operational | Zapata, Texas |
| Falcon Solar | 28INR0317 | Solar | 502.0 MW | operational | Zapata, Texas |
| Freedom Falcon BESS | 26INR0107 | Other | 501.9 MW | operational | Zapata, Texas |
| Zapata II W | 17INR0038 | Wind | 400.0 MW | withdrawn | Zapata, Texas |
| Vaquero 1 Wind | 17INR0043 | Other | 400.0 MW | operational | Zapata, Texas |
| Tetris Solar (Alternative POI) | 28INR0007 | Solar | 359.0 MW | suspended | Zapata, Texas |
| Tetris Solar | 28INR0005 | Solar | 359.0 MW | operational | Zapata, Texas |
| Saturn 1 Wind | 21INR0289 | Wind | 300.0 MW | withdrawn | Zapata, Texas |
| Sierra Madre Solar | 23INR0006 | Solar | 255.2 MW | operational | Zapata, Texas |
| Rancho Grande Solar | 28INR0503 | Solar | 251.6 MW | operational | Zapata, Texas |
| La Morena Energy Center BESS | 30INR0042 | Other | 250.0 MW | operational | Zapata, Texas |
| La Morena Energy Center Solar | 30INR0043 | Solar | 250.0 MW | operational | Zapata, Texas |
| Reloj del Sol Wind Farm | 62207_RELOJ | Wind | 209.4 MW | operational | Zapata, Texas |
| Reloj Del Sol Wind | 17INR0025 | Wind | 209.4 MW | operational | Zapata, Texas |
| Wallflower Energy Storage | 30INR0093 | Other | 209.2 MW | operational | Zapata, Texas |
| Las Lomas Wind Project | 63101_WTG | Wind | 201.6 MW | operational | Zapata, Texas |
| Vaquero 2 Wind | 20INR0055 | Wind | 201.6 MW | withdrawn | Zapata, Texas |
| Wallflower Solar | 30INR0092 | Solar | 201.2 MW | operational | Zapata, Texas |
| Zelus BESS | 24INR0131 | Other | 201.0 MW | operational | Zapata, Texas |
| Falcon Zapata Storage 138 | 26INR0116 | Other | 200.8 MW | operational | Zapata, Texas |
| Bravo ESS | 68350_BESS1 | Battery | 200.0 MW | active | Zapata, Texas |
| Barrosos Creek Wind 3 | 28INR0337 | Other | 197.8 MW | operational | Zapata, Texas |
| Cascabel Wind 2 | 23INR0561 | Other | 197.8 MW | operational | Zapata, Texas |
| Cascabel Wind 1 | 24INR0424 | Other | 197.8 MW | operational | Zapata, Texas |
| Barrosos Creek Wind 4 | 28INR0338 | Other | 197.8 MW | operational | Zapata, Texas |
| Corralitos Wind 1 | 24INR0505 | Other | 196.1 MW | operational | Zapata, Texas |
| Corralitos Wind 3 | 28INR0339 | Other | 196.1 MW | operational | Zapata, Texas |
| Corralitos Wind 2 | 24INR0506 | Other | 195.4 MW | operational | Zapata, Texas |
| Corralitos Wind 4 | 28INR0340 | Other | 195.4 MW | operational | Zapata, Texas |
| Quarter Ranch Solar | 24INR0077 | Solar | 154.1 MW | operational | Zapata, Texas |
| Saturn 2 Wind | 21INR0291 | Wind | 150.0 MW | withdrawn | Zapata, Texas |
| Slate Solar Project | 24INR0184 | Solar | 104.9 MW | operational | Zapata, Texas |
| Big River Solar | 23INR0215 | Solar | 104.3 MW | operational | Zapata, Texas |
| Falcon II BESS | 28INR0483 | Other | 103.3 MW | operational | Zapata, Texas |
| Falcon II Solar | 28INR0482 | Solar | 100.3 MW | operational | Zapata, Texas |
| Big River BESS | 23INR0237 | Other | 51.3 MW | operational | Zapata, Texas |
| BRP Lopeno BESS | 22INR0580 | Other | 9.9 MW | operational | Zapata, Texas |
| BRP Zapata II BESS | 22INR0584 | Other | 9.9 MW | operational | Zapata, Texas |
| BRP Zapata I BESS | 22INR0583 | Other | 9.9 MW | operational | Zapata, Texas |
| Lopeno | 64316_LOPE | Battery | 9.9 MW | operational | Zapata, Texas |
| Zapata | 64322_ZPT1 | Battery | 9.9 MW | operational | Zapata, Texas |
| Zapata | 64322_ZPT2 | Battery | 9.9 MW | operational | Zapata, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Vaquero Wind Energy, LLC | 4 | 787 MW |
| Falcon Energy Project, LLC | 4 | 1,222 MW |
| Rio Grande River Solar LLC | 2 | 156 MW |
| Cascabel Wind Energy, LLC | 2 | 396 MW |
| Las Crestas Wind Energy, LLC | 2 | 392 MW |
| Adapture Solar Development | 2 | 500 MW |
| Enerverse | 2 | 602 MW |
| Nextera | 2 | 759 MW |
| Falcon BESS, LLC | 2 | 703 MW |
| Saturn 2 | 1 | 150 MW |
| EDP Renewables North America LLC | 1 | 209 MW |
| Wallflower Energy Storage | 1 | 209 MW |
| Gransolar Texas Twenty Two | 1 | 154 MW |
| Sierra Pacific Home & Comfort | 1 | 255 MW |
| BRP Zelus BESS LLC | 1 | 201 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Zapata County.
Start tracking with interXdata