Castle Gap Solar Hybrid (60123_CGAP)

Castle Gap Solar Hybrid is a 180.0 MW solar interconnection project in Upton, Texas with a current status of operational.

180.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameCastle Gap Solar Hybrid
Queue ID60123_CGAP
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity180.0 MW
StateTexas
CountyUpton
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2018-05-01
Withdrawn date
Developer
Utility / transmission ownerUpton County Solar 2 LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata