Upton County Solar 2 LLC — Interconnection Queue Projects
Upton County Solar 2 LLC is associated with 3 tracked interconnection projects representing 192 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 182 MW |
| Battery | 1 | 10 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 2 |
| Massachusetts | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Castle Gap Solar Hybrid | 60123_CGAP | Solar | 180.0 MW | operational | Upton, Texas |
| Castle Gap Solar Hybrid | 60123_BAT1 | Battery | 9.9 MW | operational | Upton, Texas |
| Upton Community Solar | 61297_02567 | Solar | 2.0 MW | operational | Worcester, Massachusetts |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Upton County Solar 2 LLC.